Scope of work: Unloading and installation of production lines with a total weight of over 500 tons.

Work period: 2017-2018.

Using our equipment, specialists from “Shef Montag” can move machines of any size and weight without damaging the outer layer of the floor.

Our technologies enable the transportation of loads weighing hundreds of tons over any distance, even when there is insufficient space to use machinery adapted for such transport.